Central Plant Value Engineering

The objective for the client was to refine their present solution if possible.

The results from the study were as follows:

  • 50% reduction in BUA

  • 15% less installed capacity

  • 22% increase in efficiency

  • Simplified thermal energy storage tank operation

  • 25% improvement in part load performance

  • No single point of failure

  • Smaller standardized LV back-up gensets instead of HV units

 