Central Plant Value Engineering
The objective for the client was to refine their present solution if possible.
The results from the study were as follows:
-
50% reduction in BUA
-
15% less installed capacity
-
22% increase in efficiency
-
Simplified thermal energy storage tank operation
-
25% improvement in part load performance
-
No single point of failure
-
Smaller standardized LV back-up gensets instead of HV units